Both overhead cranes and jib cranes take heavy lifting off your team, but they solve different problems. One covers an entire building bay. The other serves a single workstation, machine or loading point. Choosing the wrong one can mean paying for coverage you do not need, or ending up with a crane that cannot reach where the work happens.
This guide compares overhead crane vs jib crane options, so you can work out which is the better fit for your workplace.
The short answer
Choose a jib crane if you need fast, simple lifting over one area, such as a machine, workbench or loading bay, and your loads are light to medium. Choose an overhead crane if you need to move heavy loads across a large area of your building, or handle loads beyond what a jib crane can carry.
How each crane works
Jib crane
A jib crane has a horizontal arm, called the boom, mounted on a wall, building column or freestanding pillar. A hoist travels along the arm, and the arm rotates to swing the load around a circular or semi-circular area. Wall mounted jibs typically rotate up to about 180 degrees, while floor mounted jibs can rotate a full 360 degrees.
Overhead crane
An overhead crane, also called a bridge crane, runs on rails mounted high along the length of a building. A bridge spans the work area, and a hoist travels across the bridge. Together, these motions let the crane reach almost any point in a rectangular area. Our guide to what is an overhead crane and how it works explains this in more detail.
Overhead crane vs jib crane at a glance
| Factor | Jib crane | Overhead crane |
| Coverage | Circular or semi-circular area around one point | Rectangular area across a full bay or building |
| Typical capacity | Light to medium loads, often up to around 2 tonnes | Light to very heavy loads, from a few tonnes to 50 tonnes and above |
| Installation | Simpler, mounted to a wall, column or foundation | More complex, with runway beams, columns and electrification |
| Building impact | Small footprint, little impact on the building | Needs a building or structure that can carry the runway |
| Lead time | Usually shorter | Usually longer, especially for custom designs |
| Cost | Lower, often from a few thousand dollars | Higher, depending on capacity, span and structure |
| Best for | Workstations, machines, loading points and repetitive lifts | Heavy loads, long spans and moving loads around the building |
When a jib crane is the better choice
- You lift repeatedly at one workstation, machine or bench
- Your loads are light to medium, such as components, dies, pumps or bags
- You want to reduce manual handling without a large investment
- You need lifting in a corner of the building, or next to an existing overhead crane
- Your building cannot support an overhead runway, but has a strong column or slab
Jib cranes are also a smart way to take pressure off a busy overhead crane, so operators are not waiting for the main crane to complete small lifts.
When an overhead crane is the better choice
- You need to move loads from one end of the building to the other
- Your loads are heavier than a jib crane can handle
- You need to cover a wide work area with many lifting points
- You need high hook heights or long spans
- Floor space is limited and needs to stay clear for forklifts and people
Single girder overhead cranes are a common choice for light to medium loads, while double girder overhead cranes handle heavier loads and longer spans.
Cost comparison
Jib cranes are generally the more affordable option. As a guide, light-duty jib cranes start from around $3,000 to $8,000 for the crane and hoist, while mid-range floor mounted jib cranes up to 2 tonnes often cost $8,000 to $25,000, plus installation. See our guide to how much a jib crane costs in Australia for a full breakdown.
Overhead cranes involve more steel, engineering and installation, including runway beams and electrification, so they cost more. The final price depends heavily on capacity, span, lifting height, duty and whether your building can support the runway.
Installation and building considerations
Jib crane
Wall mounted jib cranes need a wall or column strong enough to carry the load and turning force. Floor mounted jib cranes usually need a reinforced concrete foundation. Both are relatively quick to install.
Overhead crane
Overhead cranes need runway beams supported by the building columns or a freestanding structure. An engineer should check that the building can carry the crane and its loads. Installation involves more planning, but the crane can then serve a much larger area.
Can you use both?
The overhead crane vs jib crane decision does not always have to be one or the other. Many workplaces use both. A common setup combines an overhead crane for heavy lifts across the building with jib cranes at individual workstations. This keeps the overhead crane free for big lifts, while operators handle smaller, repetitive lifts locally. It can also reduce bottlenecks and improve workflow.
Safety and compliance
Both overhead cranes and jib cranes must be designed, installed, inspected and maintained in line with Australian Standards. They need regular servicing and periodic inspections, and operators must be trained to use them safely. See our crane maintenance checklist for what ongoing care involves.
Frequently asked questions
1. Is a jib crane cheaper than an overhead crane?
Generally, yes. Jib cranes use less steel and simpler installation, so they usually cost much less than an overhead crane.
2. Can a jib crane lift as much as an overhead crane?
Not usually. Jib cranes are typically used for light to medium loads, while overhead cranes can be designed for much heavier loads.
3. Which takes up less space?
Both keep floor space clear compared with forklifts. A wall mounted jib crane uses no floor space at all, while a floor mounted jib uses a small footprint for its pillar. An overhead crane runs above the work area.
4. Can I add a jib crane under an existing overhead crane?
Often, yes. Wall or column mounted jibs are commonly installed below an overhead crane, as long as clearances and the structure are checked.
5. How do I know which crane I need?
Start with your heaviest load, the area you need to cover and how often you lift. A crane specialist can assess your site and recommend the right option.
Talk to us about your lifting needs
HES Cranes designs, manufactures and installs both jib cranes and overhead cranes for Australian workplaces, backed by more than 25 years of experience. Tell us what you lift, where the work happens and how your building is set up, and we will recommend the right overhead crane, jib crane or combination for your site.